Julien

Dry Cargo Ships
Home   /  Ships  / Julien

General

Name
Julien
Id number
029
Price
On request

Type

Dry Cargo Ship
Construction year
1992
Shipyard
Tjechië
Length
109,96
Width
11,40
Draft max
3,25

Max. tonnage

2821,299
Height without ballast
6,60
Height with ballast

Ruim

Number of holds
Double-walled
Length of hold(s)
80 meter
Width between caoming
10,10
Hold capacity
3300 m3 (cub)

TEU

208
Tanktop
steel 52.12 mm 2023
Hatches
geen
Ballast system
2.5” 400 V deck wash pump; 4” 400 V general service pump; 400 V dirty water pump / Stern stern: 2.5” 400 V deck wash pump; 4” 400 V general service pump; Desmi 400 V ballast pump type SA 150 260 33 (1992); 400 V ballast pump with connection to the cargo hold; 400 V dirty water pump; 400V fuel trim pump

Technic

Main engine
ABC 800 RPM 1502 HP
Total running hours
Latest revision
regular maintenance and overhaul in 2007
Gearbox
Masson

Bow thruster

factory Verhaar, type 31120, power 350 kW, 4-channel system with 360 degree rotating steering drum and flat-lying propeller (1992); with ballast lines to the cargo hold / Drive: via cardan shaft and gearbox by Scania diesel engine type DSI 1450, number 554475; is currently being revised

Generator(s)

45 kVA 230/400 V generator powered by JCB 60 kW diesel engine type 448 TGWA-60, Stage V (2022); 45 kVA 230/400 V generator powered by JCB 60 kW diesel engine type 448 TGWA-60, Stage V (2022)

Steering gear

Hydraulic

Propeller

5 blade 1.70m Cunial

Nozzle

ja

Fuel

2x 25000 Litre

Fuel front

6000 Litre

Freshwater

5000 litre

Freshwater front

4000 litre

Accommodation

Wheelhouse

Alluminium overzakbaar op colom 8,5 m

Nautical Equipment

Radar, 2x VHF radio, pilot, AIS, GPS

Accomodation

3 bedrooms kitchen, room bathroom

Forwart accomodation

2 bedrooms kitchen, room bathroom

Others

Car Crane

On stern 1500KG

Certificates

CVO January 14, 2029 measurement letter March 5, 2033

Particularities

Spud pole on the bow

Recent innovations

2017, after collision damage, the bow was filled and subsequently the skin plating on the SB front was repaired at Caron in Zelzate; the electrical installation in the bow thruster room was completely renewed by Scheepselectro De Backer nv; the engines in the bow have undergone maintenance; 8 BK/23.258 JULIEN 2018 at Scheepswerf Boer in Sliedrecht, the propeller shaft was pulled, new bushes installed and honed and the grease lubrication system was renewed and a new De Waal shaft seal was installed; also aligned the main engine installation; 2019 the bow thruster shaft was renewed by Verhaar; 2020 thorough renovation of various internal parts of the main engine carried out by Reicon and, among other things, the turbo blower overhauled; 2021 the bow thruster shaft was again renewed by Verhaar; 2022 the ship was inspected in Duisburg at the Ruhrorther Schiffswerft in connection with the renewal of the Certificate of Inspection; including new stainless steel tunnel band applied to the bow thruster; in December the steering gear was overhauled at Scheepswerf Boer in Sliedrecht with new hydraulic cylinders and new bearings and bushings; both rudders also renewed; both JCB generator sets newly installed; In 2023 the steel floor was renewed at Scheepswerf Hoogerwaard in Rotterdam. The bow thruster engine is currently being completely overhauled by Teus Vlot Diesel Marine in Sliedrecht.

Interested in this ship?

Please feel free to contact us and discuss the possibility

{"autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}